category-1 TAI-FLEX OT-CATCHER
category-2 YANO STOPPER YANO STOPPER2 IV CONSTRUCTING-METHOD
category-3 MECH-A-POLY JOINT V-KING

V-KING

photo_V-KING
Our new technology can reduce the installation time drastically.



  
  

 step 1   :::INSERT:::
step1
Remake line on pipe.
Insert pipe into socket by hand.

 step 2   :::TIGHTEN:::
step2
Tighten tee head bolt-nut&non-rotatable bolt-nut untile direct metal-touch of body&retainer ring.
Completion of Tightening. (Right side)


BACK


(C) Copyright 1998-2001 All right reserved.
TAISEI KIKO CO.,LTD.