| The Yano Stopper
consists of a split tee, a rubber-faced wedge and a bonnet
which stores a spindle for vertically moving the wedge.
The wedge is inserted into a cut hole made in the pipe
by under pressure drilling. |
|
 |
FEATURES |
| ● |
The Yano Stopper
can be installed at any part on the pipeline under pressure. |
| ● |
The Yano Stopper
is installed in its full open state, and can be closed
at any time. |
|
|
INSTALLATION
TIME AND NUMBERS OF WORKER
|
|
PIPE SIZE
|
75mm
|
100mm
|
150mm
|
200mm
|
250mm
|
300mm
|
400mm
|
500mm
|
600mm
|
|
TIME
|
60min
|
60min
|
90min
|
120min
|
180min
|
180min
|
200min
|
300min
|
360min
|
|
WORKERS
|
2
|
2
|
2
|
3
|
3
|
3
|
3
|
4
|
4
|
|
|
※The
Installation Time depends on the condition of the site.
|
|
AVAILABLE
SIZE AND APPLICABLE PIPE TYPES
|
|
75mm
to600mm
Cast iron, ductile iron, steel and PVC pipes.
|
|
YANO
STOPPER INSTALLATION
|
 |
|
Set the three-piece
sleeve onto the pipeline and tighten the bolts and nuts.
Fit the tapping valve and the tapping machine. |
|
 |
|
Cut a hole,
retract the cutter and close the tapping valve.
Remove the tapping machine. |
|
 |
|
| Fit the inserting
tool in which the rubber-faced wedge and the bonnet are
set. |
|
 |
|
Push the bonnet
down to the sleeve flange and bolt the bonnet tightening.
Remove the inserting tool and the tapping valve and fit
the spindle cap. |
|
|
EXAMPLES
OF PRACTICAL APPLICATION
|
Installation
for removal of the main
To remove the existing main in connection with sewage
construction, together with tapping works. |

|
|
Installation
for precautionary measure
As an urgent valve, in connection with underground construction. |
|
Installation
into the pipe renovation area
When the sluice valves are out of order or there are no
valves. |
 |
|
Installation
for removal of the old piping
To remove the existing old piping, after Bypass piping.
|
|
|